Construction of Warri-Orerokpe Bridge

Details

Deux  Project was contracted  to construct      8.0km      of      dual carriageway  and  7.5km  of  spur road for Delta State

Construction/Provisions

Piling Works Included:

  • 36 Bore Piles  (750mm  & 27m depth.
  • Provision and Removal  All plant  and  equipment  for  the execution of the works.
  • Setting out building  and  pile positions
  • Pile Integrity test on all piles
  • Static load test  with  reaction piles

 